Quote:
|
Originally Posted by Tollster
Price was 20.00 a pallet for building the wall. They put 3 slate stair ways in and 1 bench. It would have taken me a very, VERY, long time to do on my own(120,000 LBS of rock). The 5 hands laid 17 pallets in 7 hours the first day, the 22 pallets in 6 hours the following weekend. We threw in a nice tip, a charcol grill fired meal, plenty of gatorade, and a bottle of mezcal.
|
20.00 a pallet ??? How far into Pa. are you? It's ten times that much locally

Good for you to recognize the extra effort the "hired help" gave you.
BTW, where are the pics??