Hahaha, you guys are a hoot!
Sorry about missing the Monday deadline.
Well, it's time for an update and more pictures. Progress has slowed down now but there are some significant changes to show. Most of these photos are from similar angles as the others so you can see the difference. I'll probably make fewer updates in the future unless there is significant progress so as not to bore you too much.
The progress we noted was mainly how they have the roof prepared to put the metal on. They also framed several of the rooms on the main floor so we can see what they are like. We also saw some evidence of them running electrical lines in a few (very few) places. The second story is going slow now.
This set of photos shows what the home looks like from our drive below and getting up to the homesite.
You can see some of the roof has plywood covered with tar paper. On top of that there are 2 x 6's over the front porch, but 2 x 12's over the rest of the home for added insulation in the living quarters. Those spaces will be insulated and they separate the interior roof from the exterior roof. They will put plywood again on top of the 2 x 6's and 2 x 12's. Then they will put the metal roof on top of that plywood. So it is a suspended roof with lots of insulation.
