Quote:
|
Originally Posted by TomPenny
jinman I just noticed apparently you thought the pic of the bridge with the steel on top was an example of "what to do"
i should have mentioned, this is the street brige up stream from the culvert. about 200 yards i guess.
|
I like the street bridge, but there is no way your client could afford something like that. What I like best is the picture in your second post.
Single Culvert
I also like no culvert at all with the bottom of the creek concreted so you could do a low-water crossing. I think the chances of needing to cross the bridge when it is raining hard and the ditch is full of water are pretty slim. I believe a low-water crossing would work just fine.