View Single Post
Old 05-15-2008, 09:21 AM   #28 (permalink)
YM-135trac
Bronze Member
 
Join Date: Apr 2008
Posts: 83
Default Re: Bridge Project (he only comes here when he wants something)

$6500? we,ve used 18/wheeler float(no title auction find) flipped over torched-out carrier(wheels),set on top of not too long pilings.(pole cut-offs) old cuvert(dug-out old culverts) fill made nice approachs to bridge, Worked great, 5yr. never stopped up yet? debris flow through
YM-135trac is offline   Reply With Quote