What I plan to do Eddie, is in the yellow hatched area, dig down with my excavator 5 feet, level it off, and get a ramp down in it for my dump truck.
Then dig from that platform allowing me to get that section of the pond 4-5 feet deeper. If I hit bedrock while doing that I'll make sure to cover it back up with 2 ft of clay...
It's too late for me to get the other sections of the pond deeper. It will never be dry enough for me to get in there...
