Thanks guys! To be honest I have learned a lot through this forum on fabrication of implements.

Yeah it is heavy. The tubing is 2x2x1/4" and the smaller tubing are 1-1/2x1-1/2. The tine mount is 2x2x3/8" The tubing was scrap I had, The angle was all that was available at the yard. My son and I moved a few times and I decided to finish it asap.

Drilling I cheated I waited till I got a bigger drill press. I did drill pilot holes first and drilled to size the second round. Tacking in the nuts was way easier.

The "GW" spacers (good name) were done because 3/4" washers were over a buck here and I needed a bunch. I took 1x1x1/4" square tube and cut to 23 mms. I just tack welded the washers on the four sides of the tubing. It roughly gave me a 1 inch spacer.

With what I had on hand it cost me $130 completed.

Thanks,
Dan
__________________
"My tractors do not make up for my lack of manhood, but rather make up for my lack of childhood"

-JD 2210, 200CX FEL, 52" MMM, and some addtions
-78 Case 446
-80ish 12 HP Workhorse
excelagator is offline   Reply With Quote
 
Page generated in 0.11666 seconds with 8 queries