View Single Post
Old 09-18-2008, 11:47 AM   #828 (permalink)
3RRL
Super Member
 
3RRL's Avatar
 
Join Date: Oct 2005
Location: Foothills of the Giant Sequoia's, California
Posts: 6,504
Default Re: 3R Home and Barn Project

Thanks for the reminder. My plan was to cover up the entire wall (lower section) in the shop area before making a chip. But first I need to run all the electrical and air lines. I still don't have everything in the new shop yet, so I don't even know if this layout is what I'll end up with. I've got that 4' x 8' layout/breakdown table that I need to centrally locate for easy access when working on the machines. That will take up a lot of space. It has to be located so I can drive the forklift around it ... to get to it for the giant molds I work on.
__________________
Rob-
...The Older I get...the Better I Used to be...
3RRL is offline   Reply With Quote
 
Page generated in 0.09210 seconds with 8 queries