Re: Interesting Welding Statement. Quote:
Originally Posted by Egon | sch 40. it was an effluent line transporting wastewater from one clarifier to the other. the giant knife gate was leaking by terribly allowing secondary claification water to enter the river, before it could go into the third clarifier. also when the tide would come in, tide water would back up and leak by the valve the opposite way. we blinded it off so this could this could never happen. the line now has a lateral in it that diverts all secondary waste to the third clarifier.
__________________ JD 2305, 200cx FEL, 48" MID MOWER, BALLAST BOX |