I did manage to get the backhoe in there to dig the footer, and I used the
FEL to transport the concrete. Here's some pics of the site, and the poured footer. The site is a lot steeper than it looks, the pics really don't do it justice. I used the zero-turn and my sprayer for the water supply (it holds 30 gallons). It took us all day to pour the footer (my girlfriend and me) in 90 degree heat.