Re: Bridge#2 Here's some pics of the concrete poured for the top, its 2' deep with the rest filled with gravel (No.57's), ( 38- 60# BAGS ). I back-filled the upperside also with topsoil and 57's. The long span is 25 feet, with the shorter span about 10 feet, (I haven't poured the shorter-span piers yet, i'm waiting to install the long I-beams first as to not interfere or damage the other piers). Its been slow going up till this point, hopefully most of the back-breaking work is done. |