Wyld Bill
Silver Member
I'm sure this has been discussed a dozen times but I have no tiem to do a search right now.
I have 700' fairly steep driveway. It is stonedust with gravel & rocks 4" to 6" down. It is moved quite easily if wet but if it is dry it is quite hard like set concrete.
I have a Mahindra 2615 HST with a FEL right now. I just fixed the driveway as best I could with the FEL. It was a long slow process though, it seems to be hard on the FEL, & and I could think of no good way to "crown" the road.
Should I just stick with the FEL for now or give up on the FEL & get a box blade or rear blade?
Would just a rear blade work since I have no junk in the driveway it is just mostly stone dust with some rocks here & there. When the driveway dries out will it be too hard for a regular blade to break up & move?
Thanks in advance!
I have 700' fairly steep driveway. It is stonedust with gravel & rocks 4" to 6" down. It is moved quite easily if wet but if it is dry it is quite hard like set concrete.
I have a Mahindra 2615 HST with a FEL right now. I just fixed the driveway as best I could with the FEL. It was a long slow process though, it seems to be hard on the FEL, & and I could think of no good way to "crown" the road.
Should I just stick with the FEL for now or give up on the FEL & get a box blade or rear blade?
Would just a rear blade work since I have no junk in the driveway it is just mostly stone dust with some rocks here & there. When the driveway dries out will it be too hard for a regular blade to break up & move?
Thanks in advance!