Lablovers,
Thanks for asking, the shop floor is all poured (8000 sq ft), the loading dock walls are built, and they have formed up for the bulkhead around the dock leveling system. The balance of the loading area will be finished next week and we should have steel in the air the following week.
We can't wait to get the shop up, it's tough moving as many tractors as we do through our current facility.
I saw your post with the pictures of your new machine. Looks great!