Search Forums For:
 HOME  DISCUSSIONS  PHOTOS  REVIEWS  CLASSIFIEDS  DEALERS  STORE
 

Go Back   TractorByNet.com > Related Equipment > Construction Equipment
Show Recent Threads:
24 Hours
Since My Last Visit

Reply
 
Thread Tools Display Modes
Old 10-22-2009, 10:28 PM   #1 (permalink)
Gold Member
 
Join Date: Jul 2006
Location: Southern Illinois
Posts: 439
Default Your thoughts on speeding up payouts???

I would like to bounce a couple ideas off you guys. I am having a hard time getting my contractors to pay on invoices. They let me finance their spec houses and custom built homes. I go two to three months between payouts. The only thing worse than no work is having work that you have paid all the wages, material, insurance, and vehicle expenses on and then no pay.

I am thinking about either a 2% discount on pay by the 10th or a 1% fee if not paid by the 10th. Which one would stimulate a payout, but not offend?
Please let me know which one you would respond to.
Kays Supply is online now   Reply With Quote
Old 10-22-2009, 10:52 PM   #2 (permalink)
Veteran Member
 
Dmace's Avatar
 
Join Date: Oct 2005
Location: Wakefield, NH
Posts: 1,597
Default Re: Your thoughts on speeding up payouts???

Late Fees = Bad

Incentives to pay early = Good

We always offered a 10% discount ($500 max) if NET paid in 15 days and 5% discount ($500 max) if paid within 30 days. Anything after that is full price and more then 2 months unpaid gets a collection notice sent.
__________________
Derek
Kioti CK20HST
KL120 FEL // KB2365 BH // 60" JRW 3ph snowblower // 48" HD Boxblade
Sims-Cab Depot heated cab
Pics
Dmace is offline   Reply With Quote
Old 10-22-2009, 11:42 PM   #3 (permalink)
Gold Member
 
powerstroke444e's Avatar
 
Join Date: Jan 2008
Location: Near Springfield IL
Posts: 382
Default Re: Your thoughts on speeding up payouts???

We had one local contractor remove his drive & dirt work he installed. He seems to get paid on time ever since. We're net 10 then a personal visit to here the sob story. If they seem shady require a deposit, no deposit let some one else do it for free.
__________________
If it ain't smokin' it's broken.
powerstroke444e is offline   Reply With Quote
Old 10-23-2009, 12:10 AM   #4 (permalink)
Super Member
 
EddieWalker's Avatar
 
Join Date: May 2003
Location: Tyler, Texas
Posts: 9,959
Default Re: Your thoughts on speeding up payouts???

I have one supplier that offers me an additional 3% to pay cash when buying materials instead of using credit. That's enough to make it worthwhile for me.

Eddie
__________________
Link to my Pasture Project http://www.tractorbynet.com/forums/s...81#post1650281

Link to my Deer Blind Project http://www.tractorbynet.com/forums/r...-top-deer.html

Link to video clips of me running my dozer. http://www.tractorbynet.com/forums/r...er-action.html

Link to my thread creating Lake Marabou. http://www.tractorbynet.com/forums/p...ting-lake.html
EddieWalker is offline   Reply With Quote
Old 10-23-2009, 03:06 AM   #5 (permalink)
Veteran Member
 
Iron Horse's Avatar
 
Join Date: Feb 2008
Location: Orstraya , Ex convict stock , G'day .
Posts: 1,320
Default Re: Your thoughts on speeding up payouts???

It's a little different for me but I demand $1500 paid by direct deposit every afternoon into my bank account . That way i'm only out one days pay if they go belly up or decide to be a shonk . If I let them go for say 10 days on a big job and they don't pay , i'm out $15,000 + tax = $16,500 .

I couldn't sleep in your position . Spec homes are a big ? And some of the owners are a big ??????????? I'm hoping i'm wrong but it will only be a matter of time before you get hurt . You need to be firm , your not a bank , if they can't borrow money from a bank to pay you for supplies you dont want them . If they wont borrow money from a bank because they have to pay interest on a loan and not with you , you dont want them .
__________________
Just my 2.02 cents including gst .
Advice given is only meant as a guide , please use common sense and seek professional help if in doubt .
Iron Horse is offline   Reply With Quote
Old 10-23-2009, 08:56 AM   #6 (permalink)
Platinum Member
 
Join Date: Jul 2005
Location: lower part of Md.
Posts: 725
Default Re: Your thoughts on speeding up payouts???

Quote:
Originally Posted by Kays Supply View Post
I would like to bounce a couple ideas off you guys. I am having a hard time getting my contractors to pay on invoices. They let me finance their spec houses and custom built homes. I go two to three months between payouts. The only thing worse than no work is having work that you have paid all the wages, material, insurance, and vehicle expenses on and then no pay.

I am thinking about either a 2% discount on pay by the 10th or a 1% fee if not paid by the 10th. Which one would stimulate a payout, but not offend?
Please let me know which one you would respond to.
We are not banks and are not in a position to finance anyone's projects. After 30 days, if not paid I will stop working on their project until paid. No discount if I'm floating 30 days of goods and time. After 30 days, charge the max your local jurisdiction will allow, otherwise you end up losing money, not them. Business buddies are usually only in for whatever they can get out of the deal.
I like food and toys, Buddies don't buy me either one. Cash does.
tlbuser is offline   Reply With Quote
Old 10-23-2009, 09:36 AM   #7 (permalink)
Veteran Member
 
Join Date: Oct 2006
Posts: 1,096
Default Re: Your thoughts on speeding up payouts???

You need to have a clear policy that you are willing to enforce.
A customer that doesn't pay is not a good customer.

We agreed to a price, I'm willing to bill it because not everyone writes checks everyday (heck,I've never even met some of my customers, I just send them a bill and a check shows up) but I do expect to be paid and paid on time.

If you can't pay on time, it should cost you money. I'm being a bank, banks charge interest, so do I.

After 3 weeks, you get a friendly reminder call (people do lose the bills, they get lost in the mail, whatever, stuff happens)
After 1 month, you get a "you're late, you now owe X + X%"
After 6 weeks, you get a not so friendly reminder call.
After 2 months you get another letter with X+2X% now due and the bill is not satisfied unless the late fee is paid and in 2 weeks they will hear from my lawyer.
After 75 days, you get a call from my lawyer and now you owe lawyer's fees on top of it
At 90 days, the next step is to lien the property (which is yet more lawyer's fees).

You have to be hard nosed about this. The squeaky wheel gets paid, the silent one gets ignored. You wouldn't work for free would you? Of course not, so why are you?

it's by far the worst part of the job. I've never gotten to the lawyer part, but it's all set up to happen. It takes a lot of work and frustration to get paid from some people, the interest pays for that time that I had to spend to call/write/cajole you to pay your bills.

Oh, and people who pay late all the time, they don't get the best pricing. it's only fair. And anyone over 30 days doesn't get anymore work done (obviously).
LoneCowboy is offline   Reply With Quote
Old 10-23-2009, 12:58 PM   #8 (permalink)
Silver Member
 
Join Date: May 2006
Location: Illinois
Posts: 129
Default Re: Your thoughts on speeding up payouts???

FYI

In a bankruptcy any $$$ paid out is considered preferential payment and must be returned to the court. Guess how I know this. I don't know if that's unique to Illinois or common throughout the US.

Two concerns that an owner will always have: receivables and employees.

I've never had either a bonus if net or penalty if late work.

Leins are always a way to get their attention.
__________________
JD 4310
Stuff, lots of stuff
mscheer772 is offline   Reply With Quote
Old 10-23-2009, 03:25 PM   #9 (permalink)
Platinum Member
 
Join Date: Dec 2007
Location: Eastern Ontario
Posts: 740
Default Re: Your thoughts on speeding up payouts???

3% for Cash
Credit only to a max (look at credit rating)
Prompt payment discounts usually do not work -- they do not have the money to start with
Quick to change to COD
Sounds tough but when one of these guys stiffs you for a months earnings you might feel a little different.
studor is offline   Reply With Quote
Old 10-24-2009, 12:39 AM   #10 (permalink)
Gold Member
 
Kernopelli's Avatar
 
Join Date: Oct 2006
Location: Carterville Illinois
Posts: 495
Default Re: Your thoughts on speeding up payouts???

In our PermaCrete business, we always asked for 50%down/50% upon completion...I know that isn't a realistic option for you but it worked well for us.

In our rental business, we have found that incentives were ineffective and late fees made for prompt payments. It's amazing how you can bend over backwards for somebody while giving them break after break and they get p*ssed off when you charge them a fee. It also makes them very aware of when their payment is due next month. I suspect more than half of your contractors are just like my tenants and are going to take it personal if you start implementing late fees after they are used to having a free ride for 90-120 days (or more). I think the best approach is to "soften the blow" by implementing both of what you proposed. A 2% savings incentive for paying by the 10th and a 1% penalty fee after say 30 days in all future contracts. This way you have given them an option to save money up front, pay what they owe for 30( or X amount of days) and penalized for anything longer. You can explain to them that late pays are killing you (and whether or not they want to admit it to you....everyone understands that), you have also given them fair options and you have made it clear that you are running a plumbing business but if they want to treat you like a bank you can act like one.
__________________
Darryl
Kernopelli is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off
Forum Jump


All times are GMT -4. The time now is 07:54 AM.


HOME DISCUSSIONS PHOTOS REVIEWS CLASSIFIEDS DEALERS STORE
Terms of Use | Privacy Policy | Advertise | © 2009 TractorByNet.com
 

Safety Warning: TractorByNet.com does not review discussion forum posts for accuracy or safety. Please refer to manufacturer operator and safety manuals before operating tractors or equipment. Additionally, use caution and common sense when applying any advice you receive on TractorByNet.com, and seek professional advice before attempting professional tasks.
Page generated in 0.24641 seconds with 8 queries