Search Forums For:
 HOME  DISCUSSIONS  PHOTOS  REVIEWS  CLASSIFIEDS  DEALERS  STORE
 

Go Back   TractorByNet.com > Related Equipment > Construction Equipment
Show Recent Threads:
24 Hours
Since My Last Visit

Reply
 
Thread Tools Display Modes
Old 11-02-2009, 01:15 PM   #1 (permalink)
New Member
 
Join Date: Jun 2008
Location: nj
Posts: 7
Default How are you pricing mulching jobs???

How are you all pricing jobs these days???
If I give a customer an hourly rate it will usually scare them(especially with our current economy).If I charge by the acre or square foot, then I am responsible to accurately calculate the area that I cut (which can be difficult at times). If I give a price for the job there are usually surprises or they try to add areas and larger trees to the work. Do you get a deposit up front or charge when job is completed? Which way works out the best for you??
APSmulching is offline   Reply With Quote
Old 11-02-2009, 04:23 PM   #2 (permalink)
Bronze Member
 
WestshoreConstruction's Avatar
 
Join Date: May 2008
Location: In the Bush
Posts: 92
Default Re: How are you pricing mulching jobs???

Quote:
Originally Posted by APSmulching View Post
How are you all pricing jobs these days???
If I give a customer an hourly rate it will usually scare them(especially with our current economy).If I charge by the acre or square foot, then I am responsible to accurately calculate the area that I cut (which can be difficult at times). If I give a price for the job there are usually surprises or they try to add areas and larger trees to the work. Do you get a deposit up front or charge when job is completed? Which way works out the best for you??
Most jobs are priced per Hectare or Acre and it is some what of a learning curve, for some government stuff and some larger private jobs its calculated hourly or per acre then divided into a hourly rate based on how many acres. Some people ask for hourly rates but most jobs are per acre.
__________________
Fecon FTX 148 w/ BH85 and Cimaf DAF180D,2008 Hyundai 210LC-7 Excavator w/ Denis Cimaf DAH-150,Bobcat S330 w Vts tracks,T320 X2, every attachment under the sun, Bobcat Mulcher (Fecon), Denis Cimaf DAF180D, Davco 705HS Brush cutter,Hitachi EX75 (Soon to have a cutter), Deere 690E, Hyundai 740-7, Cat D-4, Bombarier School Bus x2, Gravel trucks, Graders and a bunch of other crap that just costs me money.
WestshoreConstruction is offline   Reply With Quote
Old 11-02-2009, 05:06 PM   #3 (permalink)
Veteran Member
 
Iron Horse's Avatar
 
Join Date: Feb 2008
Location: Orstraya , Ex convict stock , G'day .
Posts: 1,320
Default Re: How are you pricing mulching jobs???

Quote:
Originally Posted by APSmulching View Post
How are you all pricing jobs these days???
If I give a customer an hourly rate it will usually scare them(especially with our current economy).If I charge by the acre or square foot, then I am responsible to accurately calculate the area that I cut (which can be difficult at times). If I give a price for the job there are usually surprises or they try to add areas and larger trees to the work. Do you get a deposit up front or charge when job is completed? Which way works out the best for you??
It is a real problem , what you say is 100% correct .

If you quote on the job , they can and will demand that every stick etc. you missed must be picked up or they wont hand over the money .

If you give them an hourly rate , they will ask you how many hours will it take , so your actually giving them a quote .

I combine the two methods and give them an hourly rate and an approximate time frame . I point out things that will be left , thing's that will be mown around and point out the fact that their time is cheap compared to mine . If they want me to pick up every stick etc , it goes on the bill . If they want to go around after me and do a little stick picking it will save them big time . This seems to work as they are prepared . People have different expectations , some think that their scrub should look like lawn when your done and will be unhappy with the usual mulched look , they need to be prepared before hand to avoid a dispute .

I also insist that my daily charge is deposited via the Net every afternoon , that way they only can dud me for one day . Most times , you don't know these people from a bar of soap , no lending institution would give them money that easy , so why should you .
__________________
Just my 2.02 cents including gst .
Advice given is only meant as a guide , please use common sense and seek professional help if in doubt .
Iron Horse is offline   Reply With Quote
Old 11-03-2009, 01:24 PM   #4 (permalink)
New Member
 
mrob2012003's Avatar
 
Join Date: Feb 2009
Location: Tyler Tx
Posts: 19
Default Re: How are you pricing mulching jobs???

This economy is a tough one isnt it? You asked one of the great questions of all time>>what works for one doesnt for the other. I am finding most of the customers in my area want a fixed quote(Residential and Farm) The question I had to ask myself was "What is my bottom line, what do I need to make it and still be profitable" I dont know about you guys but I cant work for free.. That seems to be what everyone wants now adays. If you know the limitations of your machines and be very up front with the customer you should be ok. Let them know it will not look like a peticured lawn. The mulched material has to go somewhere, on the ground, under the ground, piled you name it. I have had customers want a total clean up(no sticks on the ground) and I quoted them one. They didnt like the price so they went with the regular method, let it rot. I have a services contract that helps with any misconceptions that the customer may have about this type of service. Just be honest with them, answer any questions they may have, and dont over extend yourself(make promises you cant keep)
mrob2012003 is offline   Reply With Quote
Old 11-03-2009, 04:28 PM   #5 (permalink)
New Member
 
Join Date: Jun 2008
Location: nj
Posts: 7
Default Re: How are you pricing mulching jobs???

I find that if I give fixed price on a job, some customers are very happy with the finished product while others are worried about every peice of material that is larger than what they consider mulch. I always try to explain the capabilities of my equipment before hand but everyone has there own expectations. I have also done a total clean up for people but price changes minds quickly. On the other hand, if I give a per hour price people think it's expensive and will usually want you to rush the job and I end up with a job that doesn't look as good as it could. Which is never good because others see the work that you do and a great job speaks for itself. I usually give a fixed price based on how I would like to do it and if that's too high I will usually lower it with the understanding that the finish quality will not be as good or do a smaller area. In the end I want my customers to be happy and I want to make some money doing it. The economy is real tough, people are not spending money like they were. I use to get over 80% of the jobs that I quoted and now it's less than half. People are spending on the necesities, and clearing land is not one of them right now. If we can make it through these slow times things can only get better.
APSmulching is offline   Reply With Quote
Old 11-04-2009, 04:21 PM   #6 (permalink)
Silver Member
 
Join Date: Nov 2008
Posts: 132
Default Re: How are you pricing mulching jobs???

Quote:
Originally Posted by APSmulching View Post
I find that if I give fixed price on a job, some customers are very happy with the finished product while others are worried about every peice of material that is larger than what they consider mulch. I always try to explain the capabilities of my equipment before hand but everyone has there own expectations. I have also done a total clean up for people but price changes minds quickly. On the other hand, if I give a per hour price people think it's expensive and will usually want you to rush the job and I end up with a job that doesn't look as good as it could. Which is never good because others see the work that you do and a great job speaks for itself. I usually give a fixed price based on how I would like to do it and if that's too high I will usually lower it with the understanding that the finish quality will not be as good or do a smaller area. In the end I want my customers to be happy and I want to make some money doing it. The economy is real tough, people are not spending money like they were. I use to get over 80% of the jobs that I quoted and now it's less than half. People are spending on the necesities, and clearing land is not one of them right now. If we can make it through these slow times things can only get better.
I'm running into the same thing. People don't have the extra cash and if they do, they hire some jackleg with no insurance.
Heavyduty is offline   Reply With Quote
Old 11-05-2009, 03:22 AM   #7 (permalink)
New Member
 
mrob2012003's Avatar
 
Join Date: Feb 2009
Location: Tyler Tx
Posts: 19
Default Re: How are you pricing mulching jobs???

Quote:
Originally Posted by Heavyduty View Post
I'm running into the same thing. People don't have the extra cash and if they do, they hire some jackleg with no insurance.
AMEN HEAVY DUTY isnt that the truth.. in todays economy we all try to tell the customer what to expect but hey the real truth is we all need a Sundance Equipment, LLC - Newton, Kansas set up hmm Im such a nice guy u would think I am getting a return but im not
mrob2012003 is offline   Reply With Quote
Old 11-05-2009, 10:06 PM   #8 (permalink)
Bronze Member
 
AX MAN's Avatar
 
Join Date: Aug 2008
Location: Tuscaloosa,Al
Posts: 81
Default Re: How are you pricing mulching jobs???

Quote:
Originally Posted by mrob2012003 View Post
AMEN HEAVY DUTY isnt that the truth.. in todays economy we all try to tell the customer what to expect but hey the real truth is we all need a Sundance Equipment, LLC - Newton, Kansas set up hmm Im such a nice guy u would think I am getting a return but im not
Whats the price on that machine?
AX MAN is offline   Reply With Quote
Old 11-07-2009, 12:29 AM   #9 (permalink)
Silver Member
 
Join Date: Jul 2007
Posts: 191
Default Re: How are you pricing mulching jobs???

all you can do is be honest, don't paint it all rosy, and hope that you have an honest customer. To answer your question, you need to size up the person, get some good information, and then decide whether you want to present a quote by the hour, day, job, or acre. Some people like options. Be clear but be honest. It will come back to you if you tell them that you will work with them. they need a friend not just a contractor who is hungry and needs to move on. know your bottom line, too. For me, I have an hourly price that I need when I mulch and one that I need for everything else. After you have done it long enough, you get a good handle on how long things will take. Yes, you will make a few mistakes on timing but that is good for your next bid.
Good luck.
yellowdogsvc is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off
Forum Jump


All times are GMT -4. The time now is 05:43 PM.


HOME DISCUSSIONS PHOTOS REVIEWS CLASSIFIEDS DEALERS STORE
Terms of Use | Privacy Policy | Advertise | © 2009 TractorByNet.com
 

Safety Warning: TractorByNet.com does not review discussion forum posts for accuracy or safety. Please refer to manufacturer operator and safety manuals before operating tractors or equipment. Additionally, use caution and common sense when applying any advice you receive on TractorByNet.com, and seek professional advice before attempting professional tasks.
Page generated in 0.25521 seconds with 8 queries