Sorry, just haven't gotten round to getting those pics yet but I will. I need to report that I've used my machine for about 100 hours the last few weeks doing some tree clearing, dirt moving, and land leveling. For the tree clearing I hooked up a Virnig root grapple and used my aux. control valve. Everything worked great. This machine is a real bulldog and really gets work done. One day I dug out a 3 foot diameter oak tree that we had no other way to remove. Normally wouldn't do this with a skid loader but that's all we had. It's amazing how much root those trees have. I dug a hole about 30 feet in diamter and probably 6 feet deep to get that stump out. No problem, took about 2 hours max. That machine can climb in and out of a hole with 45 degree sides no problem. I used the root grapple to haul and stack the wood from about 25 large oak trees and a few 100 foot tall white pines. I was able to lift 16 foot log sections onto trucks. Some of these logs were close to 3 feet diameter. I also built about 100 feet of road and moved about 200 yards of dirt. So far my undercarriage is completely oil tight and the new tracks are holding up great. Haven't even had to retighten the tracks yet. The JD engine starts up with one spin of the crank even on days when it's been below freezing. I'm hoping this machine gives me many years of service.