Here are some other shots from me working on this lot. Here's me first getting started skidding out the first few logs:
I have been grinding down the stumps in areas away from the driveway, house foundation and septic drain field, where they will be removed.
I have been chipping up the tops and side branches:
Got a pretty good sized pile alerady:
So this is as far as I gotten doing it solo so far.
Things should really start picking up now with the Case on site and the operator has a helper running a saw. I just need to try to keep up with them, skidding out the trees, cutting them into 16 sections and hauling them to the mill. I'm glad I got the fuel tank shielding for my tractor and relocated my hydraulic hoses for the loader so they don't hang down like they did before! And I only get to work on the weekends (got a daytime job as well).