Buckgnarly
Platinum Member
Installed with tensioners....went with the MPCs for the asphalt driveway, but glad for clearance issues with lower links. In any case, Aquiline MPCs fit like a glove!..VERY good fit!
Chains, standard install, took 2hrs for the right side, 30 min for other. Always easier AFTER you have link counts etc for one side!
Safety wire tie pliers, one of the best investments ever...
In hind sight, an extra 10 bucks for the tensioner tool may have been worth it, but it can be done with a ratchet strap.
Snow butt whooping machine!....
Chains, standard install, took 2hrs for the right side, 30 min for other. Always easier AFTER you have link counts etc for one side!
Safety wire tie pliers, one of the best investments ever...
In hind sight, an extra 10 bucks for the tensioner tool may have been worth it, but it can be done with a ratchet strap.
Snow butt whooping machine!....