rkidd
Silver Member
I have been going to put rear remotes and run lines up to the front loader and run off of one of the remotes for a while now. Being a retired heavy equipment operator, my Kubota dealer, who I have become very good friends with asked if I would do the site work for a new storage building for him. I said yes and told him we could trade out the work and I could the remotes I wanted. I did alot of research and with the help of LD1, who speced out my dual spool valve for me, I made a plan on how I wanted to fab things up. I fabbed up the mounting bracket out of 1/4" steel plate. welded an L shape bracket and drilled the holes and mounted it to the seat bracket. It worked out so i could mount the quick couplers right in the valve assembly and mount it far enough back very good access. The factory set up runs the levers up the right fender up through where there is a storage compartment. I didnt want to lose that compartment, so I fabbed up levers that came up between the fender and the seat which worked out great for me.