TNsmallfarmer
New member
Hello,
I am trying to prep about 1.2 acres of topsoil that has been spread by a dozer so I can put grass seed on it. From what I have read a Rockhound rake is what I need to get the small to medium size rocks removed from the top layer of soil (and there is quite a bit of rock.). My question mainly is I have about 1.2 acres to do and just wondering how long that will take? I know there are a lot of variables but I am trying to complete this job between work and days when it rains. Just wondering if will take 1/2 a day, a full day, two days? I know I need to wait for the soil to be fairly dry. The layout of the property is gentle rolling. Very little steep grade. Thanks in advance for any posts!
I am trying to prep about 1.2 acres of topsoil that has been spread by a dozer so I can put grass seed on it. From what I have read a Rockhound rake is what I need to get the small to medium size rocks removed from the top layer of soil (and there is quite a bit of rock.). My question mainly is I have about 1.2 acres to do and just wondering how long that will take? I know there are a lot of variables but I am trying to complete this job between work and days when it rains. Just wondering if will take 1/2 a day, a full day, two days? I know I need to wait for the soil to be fairly dry. The layout of the property is gentle rolling. Very little steep grade. Thanks in advance for any posts!