Well i am told that my well supports 20 GPM @ 33'. To fill a 5 gallon pail at my hose bib at the house it took me 120 seconds to fill so my GPM is quite low and inorder to keep my "new" lines pressurized I am told that my current pump will not be able to keep up?
I think it would be a great idea to give it a dry run but to spend the cash on the pipe then not be able to use it for a few years till i can get a new pump etc is not doable right now.
Remember all my requirements are is to have water at the locations shown on the drawings and to possibly have temporary sprinklers set up in the future when i start to water my lawn. I was at my parents last night and they are also on a well system and there flow is similar to mine and they have 200' of 1/2" rubber hose setup and IMO the flow is fine it runs 2 sprinklers and for watering trees its plenty it is not HIGH output or anything but water flows where i need it.
I think it would be a great idea to give it a dry run but to spend the cash on the pipe then not be able to use it for a few years till i can get a new pump etc is not doable right now.
Remember all my requirements are is to have water at the locations shown on the drawings and to possibly have temporary sprinklers set up in the future when i start to water my lawn. I was at my parents last night and they are also on a well system and there flow is similar to mine and they have 200' of 1/2" rubber hose setup and IMO the flow is fine it runs 2 sprinklers and for watering trees its plenty it is not HIGH output or anything but water flows where i need it.