Freakingstang
Gold Member
Worked on the lift cylinder mounts today. I made the upper plate long enough to use my current 3"x12" cylinders. Once I can afford the 18" stroke cylinders, I will trim off the extra plate and make it look a little more appealing than just a slab of steel. Lol. Plates have not been welded or even shaped yet. Just got rough measurements and drilled one set of holes.
I may cut the boom xmember off and lower it, just depends on how much OT I get the next week or two as I will use the current twin 3x12" lift cylinders for the bucket curl.
Everything on the loader setup has been made removable, only exception are these brackets welded to the trans tunnel. Those will remain there forever...
I may cut the boom xmember off and lower it, just depends on how much OT I get the next week or two as I will use the current twin 3x12" lift cylinders for the bucket curl.
Everything on the loader setup has been made removable, only exception are these brackets welded to the trans tunnel. Those will remain there forever...