Timber
Veteran Member
I spent almost $10,000 in the last 2 weeks working on my Rail Side to keep my track in top shape. My cars average about 160,000 lbs and do a number on the rail pushing into the curve. I'm taking down a bunch of trees and clearing as much as I can to keep the area as dry as possible.