I started 40,000 sq. ft. of 3/4" topping today. Got about halfway done, but the little blue tractor was hauling flat out for 11 hrs. so no pics to speak of. I'll post up before and after pics when I get it dressed up and compacted. The driveway is bordered with chop stone...no fun.
Here's another ongoing project I'm working on. Twenty concrete pipe culvert sets. So far we've hit solid limestone slabs on every one of them. Glad I have a rock clause in my contracts! The septic guy can't start until after each culvert is signed off by the inspector. Lucky for me...he owns a fullsize hoe and a breaker.
I started 40,000 sq. ft. of 3/4" topping today. Got about halfway done, but the little blue tractor was hauling flat out for 11 hrs. so no pics to speak of. I'll post up before and after pics when I get it dressed up and compacted. The driveway is bordered with chop stone...no fun.
Here's another ongoing project I'm working on. Twenty concrete pipe culvert sets. So far we've hit solid limestone slabs on every one of them. Glad I have a rock clause in my contracts! The septic guy can't start until after each culvert is signed off by the inspector. Lucky for me...he owns a fullsize hoe and a breaker.