Dirt work was done in June 05.
Partially filled by groundwater, and runoff, and then kept topped off by well.
I beleived we moved about 16,000 cubic yards of dirt.
I had to build my pad site up about 3ft. to get out of the 100 yr. flood plain. Didn't want it to look funny so I built a huge gradual pad site.