woodmills1
Gold Member
here is a shot of my last two afternoons work after getting done with teaching. six hours, 7 hemlock logs. the product is on the ground up front. 26 2x10x16 @ $15 each. the slabs are in the forwarder, and yes the mizer is spewing sawdust while i take the picture. the dump has the material that didn't quite make it to 2x10. think building in the spring.
James "woody" Mills
James "woody" Mills