Old 05-03-2008, 01:48 AM   #21 (permalink)
Iron Horse
Platinum Member
 
Iron Horse's Avatar
 
Join Date: Feb 2008
Location: Orstraya , mate .
Posts: 529
Default Re: Bridge Project (he only comes here when he wants something)

There are 3 main types of people , One that will say something derogatory to try and bring you down below their level . One that will not say either way for maybe simillar reasons . And one that will go out of their way to say something positive and elevating , YM-135trac you are one of those , thank you .
Iron Horse is offline   Reply With Quote
Old 05-14-2008, 02:53 PM   #22 (permalink)
TomPenny
Bronze Member
 
Join Date: Nov 2005
Location: Royse City Texas
Posts: 70
Default Re: Bridge Project (he only comes here when he wants something)

jinman I just noticed apparently you thought the pic of the bridge with the steel on top was an example of "what to do"

i should have mentioned, this is the street brige up stream from the culvert. about 200 yards i guess.
__________________
Kubota B7500
TomPenny is offline   Reply With Quote
Old 05-15-2008, 06:29 AM   #23 (permalink)
jinman
Super Member
 
jinman's Avatar
 
Join Date: Feb 2001
Location: Texas - Wise County - Sunset
Posts: 7,838
Default Re: Bridge Project (he only comes here when he wants something)

Quote:
Originally Posted by TomPenny
jinman I just noticed apparently you thought the pic of the bridge with the steel on top was an example of "what to do"

i should have mentioned, this is the street brige up stream from the culvert. about 200 yards i guess.

I like the street bridge, but there is no way your client could afford something like that. What I like best is the picture in your second post.
Single Culvert

I also like no culvert at all with the bottom of the creek concreted so you could do a low-water crossing. I think the chances of needing to cross the bridge when it is raining hard and the ditch is full of water are pretty slim. I believe a low-water crossing would work just fine.
__________________
Jim
jinman is offline   Reply With Quote
Old 05-15-2008, 08:32 AM   #24 (permalink)
TomPenny
Bronze Member
 
Join Date: Nov 2005
Location: Royse City Texas
Posts: 70
Default Re: Bridge Project (he only comes here when he wants something)

Im still a little short on explaining myself . I thought it was helpful to post that street bridge pic to show what feeds this part of the creek. Water in water out.

I like the low water bridge idea. I did get a guy to come and bid on it. Im looking at 6500.00 minimum to set forms and pour concrete sides around the two culverts.

This seriously dips in to the landscape budget.

I'm going to start looking into it. any pics of a low water bridge would be appreciated. I'm going the google route for now.

txs
__________________
Kubota B7500
TomPenny is offline   Reply With Quote
Old 05-15-2008, 08:49 AM   #25 (permalink)
EddieWalker
Super Member
 
EddieWalker's Avatar
 
Join Date: May 2003
Location: Tyler, Texas
Posts: 7,500
Default Re: Bridge Project (he only comes here when he wants something)

I wonder how those culverts did in this last batch of storms. I received 5 1/2 inches of rain in 24 hours. That much water, and of course, some storms are even worse, can test just about any culvert. If those two that are in there are doing the job, then fixing something that's not broken isn't always the solution.

Making what you have there attractive shouldn't be too dificult, and probably allot cheaper too.

Eddie
__________________
My Goals for 2008

1. Fishing and Hunting with my kids.
2. Build my storage Shed.
3. Put my outside access bathroom together.
4. Fence in a quarter acre for Turkeys.
5. Build my gazebo for my front pasture.
6. Finish back pasture and plant it in Bermuda.
7. Start my food plots.
8. Build a comfortable deer stand for two.
9. Build a wood burning fireplace in my home.
10. New flooring in my home.
11. Build a pasture sprayer.
12. Get my old jeep running.
EddieWalker is offline   Reply With Quote
Old 05-15-2008, 09:00 AM   #26 (permalink)
TomPenny
Bronze Member
 
Join Date: Nov 2005
Location: Royse City Texas
Posts: 70
Default Re: Bridge Project (he only comes here when he wants something)

I agree there too Eddie. One complication I do have is that one of the culverts has been lifted about a foot on the inlet side. Its clear this is because the culverts weren't set at the right angle, as someone mentioned earlier. They are at a slight angle and water crashes against the outer edge of the curve cause all kinds of problems

This setup may have lasted if it weren't for that. So the question is even if you fixed it with concrete would it not continue to pick at it. I was looking really hard at you bag solution. Do you think it would work well with two culverts.


A low water crossing is also known as a ford. Boy, try googleing that.
__________________
Kubota B7500
TomPenny is offline   Reply With Quote
Old 05-15-2008, 09:04 AM   #27 (permalink)
TomPenny
Bronze Member
 
Join Date: Nov 2005
Location: Royse City Texas
Posts: 70
Default Re: Bridge Project (he only comes here when he wants something)

here is a Ford crossing a ford.
Attached Thumbnails
bridge-project-he-only-comes-ford.jpg  
__________________
Kubota B7500
TomPenny is offline   Reply With Quote
Old 05-15-2008, 09:21 AM   #28 (permalink)
YM-135trac
Bronze Member
 
Join Date: Apr 2008
Posts: 83
Default Re: Bridge Project (he only comes here when he wants something)

$6500? we,ve used 18/wheeler float(no title auction find) flipped over torched-out carrier(wheels),set on top of not too long pilings.(pole cut-offs) old cuvert(dug-out old culverts) fill made nice approachs to bridge, Worked great, 5yr. never stopped up yet? debris flow through
YM-135trac is offline   Reply With Quote
Old 05-15-2008, 09:24 AM   #29 (permalink)
EddieWalker
Super Member
 
EddieWalker's Avatar
 
Join Date: May 2003
Location: Tyler, Texas
Posts: 7,500
Default Re: Bridge Project (he only comes here when he wants something)

Yes, the bags will do the job, but you have to be sure to get them under the culverts too. Then when they are all in place and rebar is driven through them, you have to pour loose sacks in between the culverts to fill that cavity. Like everything, it's all about the small details.

If it was me, I think I'd reset the culvert, then build a form with plywood and lumber to pour a solid wall. The angle of the culvert won't matter if the entrance and exit of the culverts is protected by cement. Left unprotected, the water will just keep wearing away at the edges of the culverts until they fail. It's a time thing, and water always wins with enough time.

Another option would be to pour a brick ledge on the concrete wall and tell the client that you could come back at a later time when they have the money and put in rock vineer. With the brick ledge in place, you could do this at any time and until then, it would still look good. You might get two jobs out of one!!!

Eddie
__________________
My Goals for 2008

1. Fishing and Hunting with my kids.
2. Build my storage Shed.
3. Put my outside access bathroom together.
4. Fence in a quarter acre for Turkeys.
5. Build my gazebo for my front pasture.
6. Finish back pasture and plant it in Bermuda.
7. Start my food plots.
8. Build a comfortable deer stand for two.
9. Build a wood burning fireplace in my home.
10. New flooring in my home.
11. Build a pasture sprayer.
12. Get my old jeep running.
EddieWalker is offline   Reply With Quote
Old 05-15-2008, 09:36 AM   #30 (permalink)
EddieWalker
Super Member
 
EddieWalker's Avatar
 
Join Date: May 2003
Location: Tyler, Texas
Posts: 7,500
Default Re: Bridge Project (he only comes here when he wants something)

Quote:
Originally Posted by TomPenny
I did get a guy to come and bid on it. Im looking at 6500.00 minimum to set forms and pour concrete sides around the two culverts.

I didn't notice this before.

That is crazy!!!! Max, you're looking at two yards for each side to build up a wall with a footing that goes two feet into the ground. You could rent a small excavator for a few hundred dollars and dig the trench yourself real easy in one day.

The next day, you could spend $200 for forms and have them built in a day easily. Cut and bend some rebar to make it secure for another $200 in materials.

The third day, you just have a cement truck show up and pour the cement. At four yards and $130 a yard, it's $520. That should be over the minimum for most cement companies, but even if it's a five yard minimum, your still under $700.

It's well under $2,000 in materials for a three day job. Two full days and then two half days when you take down the forms. Charge what you want for labor, but I'd bid it at $3,500 if it was a job that I was going to do.

Eddie
__________________
My Goals for 2008

1. Fishing and Hunting with my kids.
2. Build my storage Shed.
3. Put my outside access bathroom together.
4. Fence in a quarter acre for Turkeys.
5. Build my gazebo for my front pasture.
6. Finish back pasture and plant it in Bermuda.
7. Start my food plots.
8. Build a comfortable deer stand for two.
9. Build a wood burning fireplace in my home.
10. New flooring in my home.
11. Build a pasture sprayer.
12. Get my old jeep running.
EddieWalker is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Forum Jump



All times are GMT -4. The time now is 08:29 PM.


HOME DISCUSSIONS PHOTOS REVIEWS CLASSIFIEDS DEALERS STORE
About TractorByNet.com | Terms of Service | Advertise | © 2008 TractorByNet.com
 
Page generated in 0.27380 seconds with 11 queries