Mean Jean
Gold Member
I picked a bad time to start this project.
I hadn't planned on starting til the fall.
On Friday I found myself in the backyard with the tiller attached and 1 thing led to another. Now I've got a landing strip 65 feet long and there's no going back!
I'm hoping to be done next Sunday.
I started by tilling then scraped what I could with the loader.
Using railway ties as edging, gravel as the path.
Pick and axe to set my edges.
It's slow going but there is progress.
Would be much easier if I wasn't a sissy!
I hadn't planned on starting til the fall.
On Friday I found myself in the backyard with the tiller attached and 1 thing led to another. Now I've got a landing strip 65 feet long and there's no going back!
I'm hoping to be done next Sunday.
I started by tilling then scraped what I could with the loader.
Using railway ties as edging, gravel as the path.
Pick and axe to set my edges.
It's slow going but there is progress.
Would be much easier if I wasn't a sissy!