I have a 10x12 storage shed that I am redoing. The one side beam was rottening and I replaced it. The floor joist were originally on 2' centers. I went back and added beams for it to be on 1' centers. I forgot to take pictures of the underside before i let it back down. I have 3 4x4 runners underneath of it. I am going to move it. To get the building up to where I could crawl under it I used the L4240 to pick it up and then supported it with concrete blocks. Here is a picture of me letting it back down.
The tractor had now problem lifting it.
Now I need to get the new site prepped for it. Then move it. I am going to residing it with smart siding I think it is called. It is like t-111 but supposed to be better, It has a 50 year guarantee.
The tractor had now problem lifting it.
Now I need to get the new site prepped for it. Then move it. I am going to residing it with smart siding I think it is called. It is like t-111 but supposed to be better, It has a 50 year guarantee.