oldboyscout
Silver Member
I'm trying to build a small workshop on a "pay as I go" budget. I was going to pour a floating slab and put a metal carport/garage (TNT style) on it.
the current problem is I realized I can't get a cement truck closer than about 75'. So I know pouring the pad is going to get expensive.
So I'm wondering if an option would be, to dig postholes and pour piers to put the garage on, and then pour the pad in sections by hand later.
any thoughts?
the current problem is I realized I can't get a cement truck closer than about 75'. So I know pouring the pad is going to get expensive.
So I'm wondering if an option would be, to dig postholes and pour piers to put the garage on, and then pour the pad in sections by hand later.
any thoughts?