Slicer1972
New member
Hey been searching the web for help and have read numerous posts on here (about the only place I've seen about dyi build bridging). But haven't seen what I need. Trying to replace/build a bridge (had to pick up the old one do to age rotting and beavers). From edge to edge of the creek is 15 feet the old bridge was a beam bridge put down like that. The water level is usually 3-4 feet below the bridge. High water mark is around the top of the land but that's a rarity. Trying to make it where I can cross it with my Ford 555D backhoe (14,000 pounds) so I can start cleaning up the back side of the property. Been thinking about using 25-30 foot telephone poles and using a wire on both sides to the center kinda as a suspension/beam bridge.