I am in the beginning stages of building a house and suggested that the contractor dig a pond to get the fill dirt needed for the site work.
The fill from the pond will need to be moved about 200 feet.
The pond will be nearly 1/2 acre in size.
Any idea on how much I might expect to spend to get the pond in place and the fill dirt moved?
Thanks
Eric