4x4dump
New member
I have a lady I do handyman work for that needs about 3000 ft of field fence put up. mostly flat straight runs between 250 to 450 ft runs using t-post (replacing electric fence that is now on the t-post) I will have to put in some corner posts and a few t-post where needed (about 75% of the the post are in place already) The problem is she wants a price to do this up front. I need some idea of how long it might take to string 330 ft rolls of field fence on the existing t-posts. I have done some fence work before, but not this much. I just need help with time involved to do this job. /forums/images/graemlins/confused.gif