RobA
Platinum Member
I've posted a few questions here related to an equipment barn. The more I look into this the more questions I wind up with.
Let's assume that I am going with a 24'x36' barn with wood siding (probably board & batten) and a concrete floor.
- If I have a pole barn built how would the concrete floor be prepped and poured? Before or after the barn is built?
- If I have 1 split door to get equipment in/out of the barn where would you put it? On one of the long or short walls? Centered or towards the corner?
Thanks for any help. It's appreciated.