Obed, here are some pis of a road currently under constuction. Pic #1 is of a properly graded subgrade. That is pitched to drain. Although not done yet. I wanted to give you an idea of what it should look like when almost done. When finished it should not have any tire or tread marks. And should be hard enough to not leave any tread marks when driving over it. If it does you need to work on it some more.

Pic #1
http://i138.photobucket.com/albums/q...R/P1010945.jpg


Pic#2 shows a grade that is not ready for stone. Notice the small water holes. These holes will cause problems later if you stone it before they are graded out.

Pic#2
http://i138.photobucket.com/albums/q...R/P1010946.jpg

Again I cannot stress enough how important it is to spend a lot of time on grading the subgrade properly. If you skimp here you will pay for it later. Either in needing additional stone or grading out the potholes. So do it right from the beginning.

One other thing. When it drys out if there are any wet spots you need to determine where and why its wet. If needed, a french drain should be constructed to dry up any wet spots if its ground water.see pic #3 There is water bleading out of the bank. It will need to be corrected to dry it up before I can stone the road.

pic#3
http://i138.photobucket.com/albums/q...R/P1010947.jpg
__________________
"Good judgement comes from experience.Experience comes from bad judgement."
dirtworksequip is offline   Reply With Quote
Old 01-09-2007, 12:07 AM   #2 (permalink)
Platinum Member
 
LarryD's Avatar
 
Join Date: Mar 2004
Location: Whidbey Island, WA.
Posts: 675
Default Re: GOOD & BAD SUBGRADE

[quote=dirtworksequip]One other thing. When it drys out if there are any wet spots you need to determine where and why its wet. If needed, a french drain should be constructed to dry up any wet spots if its ground water.see pic #3 There is water bleading out of the bank. It will need to be corrected to dry it up before I can stone the road.[quote]

With as much rain as we've had here, you'd be hard pressed to find a DRY spot. I've got water bleeding out of spots where it never was before...so much for the mild winter predicted.

I have always liked the "proof rolling" method. If the ground shows any deflection under construction equipment it probably isn't up to suitable compaction.
__________________
Make welfare as hard to get as a building permit
LarryD is offline   Reply With Quote
Old 01-09-2007, 12:19 AM   #3 (permalink)
Silver Member
 
Obed's Avatar
 
Join Date: Dec 2006
Location: Cumberland Plateau, TN
Posts: 152
Default Re: GOOD & BAD SUBGRADE

Quote:
Originally Posted by dirtworksequip
Obed, here are some pis of a road currently under constuction.
dirtworksequip,
Thank you so much for the help. I'm sure getting an education. Now I'm playing the waiting game until it gets dry enough that I can pack down my road. CUT Box Blade Newbie - Road Pictures With all the help I'm getting from TBN folks, I'm optimistic that I'll have a great road at some point.
Obed
__________________
John Deere 4210 (28 HP) FEL BH, 6' Box Blade, Loader Forks, looking for 60" rotary cutter
Obed is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


All times are GMT -4. The time now is 08:50 AM.


HOME DISCUSSIONS PHOTOS REVIEWS CLASSIFIEDS DEALERS STORE
About TractorByNet.com | Terms of Service | Advertise | © 2008 TractorByNet.com