The only concrete work I've done so far was sonotubes to anchor my pipe frame horse barn. This time I need a slab 25' x 30'. I'll have someone else do the pour, I want to do all the prep work. I'll be getting a carport soon.
My tractors have been kicked out of the barn to make room for hay...so I'm getting a plot ready to dig and build forms. Had to remove several large trees and many large rocks, almost done with that part of the job. Will be digging footings and prep work for forms.
Would love to see pictures of forms (set up and ready) before the pour. So if you have pictures or can add a link to a site I'd appreciate it.
Thanks....
My tractors have been kicked out of the barn to make room for hay...so I'm getting a plot ready to dig and build forms. Had to remove several large trees and many large rocks, almost done with that part of the job. Will be digging footings and prep work for forms.
Would love to see pictures of forms (set up and ready) before the pour. So if you have pictures or can add a link to a site I'd appreciate it.
Thanks....