We are putting up a 72'x300' clearspan building from FarmTek that arrives July,1.
Our whole property is on a slight slope. The SW end is the highest point. The SE end (72'ft away) is 2.5' lower. The NW corner (300' away) is 2' lower and NE end is 4'10" lower.
That's a ton of fill needed to make it level. So my husband wants to build up the lowest corner 2'10" decreasing the slope instead of making it perfectly level. I'm really not sure about this... especially since the lowest end of the building is going to have stalls. Do you think it will be ok?
Our whole property is on a slight slope. The SW end is the highest point. The SE end (72'ft away) is 2.5' lower. The NW corner (300' away) is 2' lower and NE end is 4'10" lower.
That's a ton of fill needed to make it level. So my husband wants to build up the lowest corner 2'10" decreasing the slope instead of making it perfectly level. I'm really not sure about this... especially since the lowest end of the building is going to have stalls. Do you think it will be ok?