bruceha2000
Gold Member
Some time before the crash of '29. As near as I can tell, order of build was:I will start
1917 2x6's are all full 2" x 6" makes repairs fun
- original house 15x24, 2 floors.
- Wrap around porches added (same time?), enclosed on the front (same time?)
- bathroom added in north side porch
- kitchen added on back porch
The kitchen is where I get the 'before' date. When we rehabbed - 20 years ago, we ripped off all the 'not original house' parts. Had rot in places (such as the bathroom ceiling, I've never seen so many carpenter ants in one place!) and we wanted to jack it 2 feet so I could stand up in the basement. Cheaper to jack smaller unit without porches and wanted to put full foundation under them anyway for more storage. When we started through the kitchen floor we found (in order from the top):
- linoleum
- plywood
- newspapers from Sept 1929 - used to 'level' the floor before adding the above
- rotted painted rug
- 1x6 T&G pin laid diagonally
- 1x6 T&G pin laid diagonally the other way.
Man what a pain that was to get through!
And yes, we have true 2 bys, back when the dimensions were AFTER cutting to finish size, not before.