Wanting to build a road is one thing, being able to is another.
Have you done a perc test to see how quickly the ground takes water?
You can either build it one of three ways;
1. push through with a very, very large dozer and push all the trees back
fifty feet on either side to prevent regrowth from reaching the opening
2. push through with the heavy dozer and use a grader to build the road up and
hope its dry enough to work to make a taller dirt road with the dirt that
is there
3. push through with the heavy dozer and wide enough with the dozer so that the
dozer can dig the ditches if it has a 6 way blade a use the dozer to spread crushed
stone on the crown of the road.
Options 1,2, and 3 depend solely on whether the municipality will let you do this.
Have you done a perc test to see how quickly the ground takes water?
You can either build it one of three ways;
1. push through with a very, very large dozer and push all the trees back
fifty feet on either side to prevent regrowth from reaching the opening
2. push through with the heavy dozer and use a grader to build the road up and
hope its dry enough to work to make a taller dirt road with the dirt that
is there
3. push through with the heavy dozer and wide enough with the dozer so that the
dozer can dig the ditches if it has a 6 way blade a use the dozer to spread crushed
stone on the crown of the road.
Options 1,2, and 3 depend solely on whether the municipality will let you do this.