If you look at the picture below, you see the inside of my pole building. Looking at the walls (inside to outside), first you have 6 by 6 posts, then you have 2 by 6's nailed horizontally to the posts, finally you have the metal sheeting screwed to the 2 by 6's. There is a 1 3/4 inch gap...