Mike058
Gold Member
Our turnaround is bare of gravel in some places. I'd like to bring old gravel to the top. I have a 35HP tractor, loaded tires and a landscape rake. One question is how deep do I eventually set the tines? And should I make a couple of passes shallower and then lower the rake, or just drop it down as far as my tractor can pull it? I don't want to move any gravel around, so I was planning on removing every other tine. Thanks.