JDGreenGrass
Veteran Member
We've had rain on and off for a week or more so I thought today, being Sunday, I would re-work the gravel driveway. Between the Rear Blade and the 770 and my keen eye for grade....it came out nice. Took me about 2hours working mostly in 2nd gear, low range. 10 minutes of hand rakeing and just a touch of back dragging with the bucket and I was done.
Should have taken some before pictures...but I didn't.
Should have taken some before pictures...but I didn't.