I'm building a koi pond. It is dug into the side of a slope. The outer wall is about thirty feet long concave inward. This outer wall will be about five feet high and built of 8 x 8 x 16 concrete block and then waterproofed.
The wall will be backfilled about two thirds of the way. The upper two feet or so will have no support from the earth.
Should I run lateral rebar in every course? Two twenty foot sticks overlapping ten feet in the center? Or can I get away with rebar in every other course? I'm planning on using 5/8 in rebar. Would 1/2 be adequate?
Does the bottom course need rebar? It will be backfilled with concrete.
How often should I drop vertical rebar? Every third hole?
Thanks
Zeuspaul
The wall will be backfilled about two thirds of the way. The upper two feet or so will have no support from the earth.
Should I run lateral rebar in every course? Two twenty foot sticks overlapping ten feet in the center? Or can I get away with rebar in every other course? I'm planning on using 5/8 in rebar. Would 1/2 be adequate?
Does the bottom course need rebar? It will be backfilled with concrete.
How often should I drop vertical rebar? Every third hole?
Thanks