Once it's dry out there, if the area you need gravel is pretty close to level and the first pictures represent it well, the driver should be able to tailgate the majority. I built about a 450' driveway last year and had 4 loads of SB2 Grade 7 tailgated on it. It ended up being deeper than it needed to be, 3 loads would probably have done it. Tailgating just means the driver will chain the tailgate so it will only open a few inches and drive while its dumping. It ends up about the width of the truck and the depth can be controlled by the speed of the truck within reason. If they do a good job with it, any type of rear blade would be ok.
Around here SB2 Grade 7 is called road base. It's probably 2-3 inch stone with the fines in it. It packs really well and stays put. I built up and crowned my base with shale that I dug on site then topped it with the road base. So far we have had some long, heavy soaking rains and it did not effect the driveway.
-