flusher
Super Member
- Joined
- Jun 4, 2005
- Messages
- 7,538
- Location
- Sacramento
- Tractor
- Getting old. Sold the ranch. Sold the tractors. Moved back to the city.
Started this 20x28 ft shed last Sept. Got the final trim pieces installed today. It's a basic pole frame design--two 14x20 ft bays, 10ft roof height dropping to 9ft on the East side. Roof and siding is 29 ga R-panel. A simple one-man construction project. That's my 1951 Farmall Super A inside for scale. Figure I have about $3500 in materials invested.
Need to order another piece of trim to fix up the gaps near the top of the two verticals on the West side. I'll add this to the materials list for another one of these sheds that I'll build adjacent to this one next Spring. Plan to shed my MF-124 baler and my Minneapolis Moline P3-6 grain drill in this one.
Need to order another piece of trim to fix up the gaps near the top of the two verticals on the West side. I'll add this to the materials list for another one of these sheds that I'll build adjacent to this one next Spring. Plan to shed my MF-124 baler and my Minneapolis Moline P3-6 grain drill in this one.