I need to remove a 6' high 18" thick concrete pier. I have been told that it may be 4' in the ground and is in the center of a 12' square concrete pad that is about 6" thick. To complicate things, it is close to a building and the pad is part of the building.
This is left over from an observatory that was attached to this building. I would like to save the pad if I can and the building!
I was thinking of cutting the concrete 3' from the building and breaking out the rest and renting a hoe to dig out the pier, hoping not to damage the building in the process. I would then need to pour a new pad.
Any better ideas?
Thanks
Don va3any
This is left over from an observatory that was attached to this building. I would like to save the pad if I can and the building!
I was thinking of cutting the concrete 3' from the building and breaking out the rest and renting a hoe to dig out the pier, hoping not to damage the building in the process. I would then need to pour a new pad.
Any better ideas?
Thanks
Don va3any