Ok I can make that work I'm getting ready for a rough in inspection soon and I need to finish running the 3 circuits to the new addition!! ThanksYou shouldn't run more than two cable assemblies the same hole.
Ouch those are expensive..Make a new hole with a Lee hole puncher or whatever the term is for the tool--makes neat holes.
HTH
Arkaybee
pat32rf said:While we often do install two wire per connector, you aren't really supposed to. Some inspectors are more fussy than others. You are only allowed three #12 or four #14 in a1/2" raceway. By the time you add the ground wire of the roamex, you would be over your allowable fill.....