RobA
Platinum Member
I just had a concrete floor poured in my pole barn. 4" of gravel, rebar 2' on center and 4" of concrete. How long should I let it cure before filling the barn up? I'll be puting my tractor, bush hog and ATV in it. Tractor is heaviest thing at about 5,000 or 6,000 (??) pounds. Everything else won't be nearly as heavy.