dqdave1
Veteran Member
It is not theory. As concrete cures it gets stonger; the day it is fully cured it is at its strongest; from that day on the concrete begins to get weaker. The Hoover dam is still curing; the day it completely cures will be the day it begins to get weaker. Yes it will need to be torn down someday as it wil not be able to withstand the water pressure. Don't worry; it will take a few more years. ( hundreds)
You did not mention the type of concrete you used ( 6 sack, 6.5 sack or 7 sack); this also determines time line. At 4" you are at a miniumum depth; I hope you did not use 2 x 4 lumber; this is only 3 1/2" and will not hold up to weight very well; if you used standard concrete forms; they are 5" and are acceptable to the weights you will be putting on floor.
You did not mention the type of concrete you used ( 6 sack, 6.5 sack or 7 sack); this also determines time line. At 4" you are at a miniumum depth; I hope you did not use 2 x 4 lumber; this is only 3 1/2" and will not hold up to weight very well; if you used standard concrete forms; they are 5" and are acceptable to the weights you will be putting on floor.