RadarTech
Elite Member
After years and years of this bank washing and covering the gravel to the shop… I finally dug out the bank… we have about 5 ft of property to the property line.. and I’ll use all that dirt and then put up a small retaining wall…
The new Yanmar YT359c DID GREAT… if I’m right a heavy heaped bucket should be about 16-18 cubic ft.. so 2 would be a yard..built a dirt pile from the bank spoils.. and then moved it to the drop area.. the pile which I forgot to get a picture of was 7-8 ft tall, 12-14 ft wide and 8 ft deep.. I’d estimate at least 20 cubic yards..maybe a little more…..
Roughly 9 hours of work.
The new Yanmar YT359c DID GREAT… if I’m right a heavy heaped bucket should be about 16-18 cubic ft.. so 2 would be a yard..built a dirt pile from the bank spoils.. and then moved it to the drop area.. the pile which I forgot to get a picture of was 7-8 ft tall, 12-14 ft wide and 8 ft deep.. I’d estimate at least 20 cubic yards..maybe a little more…..
Roughly 9 hours of work.