Hi again,
I need some help/advice on a little project I am working on.
The picture here.. Field is of an area that I eventually would like to be as smooth as possible but not sure what the next step should be. It was just tilled and the gentleman that did the tilling said it would be better to wait until it rained so it would pack down a bit before trying to drag it or do anything else.
I am questioning his logic, thinking he may just be just buying time so he can get to other jobs that may be a little more lucrative. I have access to a tractor and could rig up a drag using an old railroad track section. Should I drag it now or wait until it rains? Any other ideas or advice? Am even thinking about going out and renting a small powered roller to roll it.. Have no idea what I am doing just want to end up with a very smooth surface, any input would be appreciated.
Thanks
Bob
I need some help/advice on a little project I am working on.
The picture here.. Field is of an area that I eventually would like to be as smooth as possible but not sure what the next step should be. It was just tilled and the gentleman that did the tilling said it would be better to wait until it rained so it would pack down a bit before trying to drag it or do anything else.
I am questioning his logic, thinking he may just be just buying time so he can get to other jobs that may be a little more lucrative. I have access to a tractor and could rig up a drag using an old railroad track section. Should I drag it now or wait until it rains? Any other ideas or advice? Am even thinking about going out and renting a small powered roller to roll it.. Have no idea what I am doing just want to end up with a very smooth surface, any input would be appreciated.
Thanks
Bob